Electrical Cable and Water Pipe Installation Ashbourne

Electrical Cable and Water Pipe Installation

A Davis Trencher 700 is used to cut a narrow trench into the ground for the installation of electrical cables, ducting for BT cables etc, water pipe and land drainage. Using this machine causes minimal ground disturbance to aid the reinstatement of the area after the works have been completed.

Installation of water pipes                         Electrical Cable Installation

Tarmac Driveway and Block Paved Parking Area, Belper, Derbyshire

The block paving car parking area created here adds interest to the very functional tarmaced driveway.

The block pavers used are called Eaton. To see a sample of these please visit Tipper Building Merchants, Uttoxeter

Please click on this link       http://www.tippersbm.co.uk/branches/tippers_uttoxeter_branch.aspx

 

Please call us for a quote to transform your driveway. To see our most recent testimonials click on the Derbyshire Trusted Trader logo found on our home page

Tarmac Driveway

Hydraulic Loading Platform Heanor, Derbyshire

The Hydraulic Loading Platform enables heavy machinery to be loaded into the lorry trailer easily using a fork lift truck. This eliminates risk because there is no loading at heights.  The second image shows the loading bay and loading dock created using concrete blocks, shuttering and  reinforced concrete.

 Hydraulic Loading Platform                  Loading Bay and Loading Dock